Friday, September 13, 2019

Control4 CA-10 Designed for Maximum Uptime

With automation controllers designed to run projects of any size, having a system failure can be catastrophic. In a large project, the failure of the main controller or processor could mean that lights don’t work, security integration fails, surveillance cameras would be unreachable, and all the home’s entertainment systems would also go offline. To ensure that these mega-projects keep working through either snow, rain, heat or gloom of night, Control4 unveiled its latest flagship controller, the CA-10 Automation Controller.


from
https://www.soundandvision.com/content/control4-ca-10-designed-maximum-uptime

No comments:

Post a Comment